SOME COMPLETED PROJECTS


STANDARD ENGINEERING CONSTRUCTION COMPANY LIMITED have

satisfactorily executed several projects for reputable oil companies. Some of the jobs so far

executed are as follows:

   SHELL PETROLEUM DEVELOPMENT COMPANY LIMITED (SPDC) – WARRI

(i) Land Flowstation Gantry (P.D. Meters) Realignment

(ii) Removal of XHP Separator from Ughelli West Flowstation

(iii) Provision of Logistic cover for PH Intelligent Pig Survey Swamp

(iv) Erection of 65 x 78m Bundwall at Odidi II Flowstation Flare.

(v) Construction of Bundwall around Benisede Flowstation Flare.

(vi) Opuama Flowstation Pumpset Changeout (Project executed at Sapele West Flowstation).

(vii) Installation of Sulzer Centrifugal Pumps at Benisede(6nos) and Sapele Flowstations.

(4nos)

(viii) Construction of 4” x 7Km Olomoro-Oweh Gas Pipeline.

(ix) Provision of Engineers for field operations

(x) Improvement of Compressor Stations, Flowstations and Gas Plants.(UQCC)

(xi) Construction of 2” x 6” x 700m Buried Gas Flowlines and 2 x 1” x 800m Corrosion inhibitor

injection lines from LLBL-1 to Ughelli East Gas Plant.

(xii) Construction of 2x6” x 1.5Km buried gas flowlines and 2x1” x 1.5KM Corrosion inhibitor
injection lines from IVIU-1 and IVIU-2 to Oben Gas Plant. Steel rakes for the Warehouse.

(xiii) Construction of Flowlines Replacement in Land Oil Fields - Commencing from Oben

Field.

(xiv) OBEN flowline replacement project

(xv) UZEER flowline replacement project

(xvi) Installation of SULZER pumps at KOKORI flowstation

  NNPC REFINERY - WARRI

(i) Construction of Steel Rakes for the Warehouse.

(ii) Mechanical works and modification of materials Management Warehouse.

   NNPC, PPMC - WARRI

(i) Construction, sandblasting, painting and installation of overhead water tank at Lokoja Pump

Station.

(ii) Construction of concrete drain and massive filling of deep gullies at NNPC Pipeline trace at

KM 130.

   NIGERIA AGIP OIL COMPANY LIMITED - PORT HARCOURT AND WARRI DIVISION

(i) Reconstruction of Warri Jetty - Completed

(ii) Resurfacing of Oshie oil field main road 6KM completed May 1985.

(iii) Resurfacing of Taylor Creek access road completed March 1986.

  DAEWOO NIGERIA LIMITED - PETROCHEMICAL WARRI

(i) Construction, Sandblasting and Painting of 500,000 Gallon Water Tank and distribution

system.

DUBRI OIL COMPANY LIMITED - BENIN CITY

(i) Installation of Gele Gele Flowstation and all piping works

(ii) Construction of 8” Ø Sch 80 bulk flowline in Gilli Gilli oil field.

(iii) Preparation of well 4 location access road and camp site for work over rig.

(iv) Construction of 2 x 4” x 5 KM flowline from Ovia I to Gilli Gilli flowstation and access road

from Ovia I to Gilli Gilli I Wellhead.

(v) Provision of radiography inspection for various welds

(vi) Preparation of Ovia B Location, access road and camp site.

(vii) Hook-up of Gili Gili Well 1 and laying of test lines at the wellhead.

(viii) Construction and Installation of 3Nos Clamp for GGN 1 flowline.

(ix) Renovation of Company Guest House in Benin city

(x) Replacement of water line in Gele-Gele flowstation.

(xi) Replacement of Ruptured flowline from Ughton well 1(120m).

(xii) Reconstruction of 3” Vandalised flare line at GGN-1 location.

(xiii) 2005 Annual maintenance of Gele-Gele flowstation Equipment.

(xiv) Supply and Installation of various valves and materials at Gele-Gele flowstation.

(xv) Fabrication of SPOOLS for vandalized spot and installation of valves

(xvi) 2008 Annual maintenance of Gele-Gele flow station /Equipment and replacement of 3”

Flare line at GGN1
 
    TEXACO OVERSEAS (NIG) PETROLEUM COMPANY UNLIMITED

(i) Funiwa ‘A’ ATK Line

(ii) Fabrication/Modification of sampling spools

(iii) Hook-up of North Apoi Production Station to North Apoi ‘I’ Quadrapod Time (Tie in).

(iv) Remove the Test Separator in Pennington and Install at North Apoi for low pressure wells.

(v) NAPS Manifold Ligaments and Valves Replacement.

(VI) FUNIWA Salt and fire line.

(VII) North Apoi Quarters Cellar Deck Plating.

(VIII) Provision of Inspection services for construction operation


    PAN OCEAN OIL COMPANY - BENIN CITY

(i) Construction of 2x6” x 6KM Bulk Flowline at Ologbo oil field and construction of access road

to Ologbo 2 and 3 respectively.

(ii) Construction of a flare bundwall and flare stack conversion at Ogharefe Flowstation.

(iii) Fabrication and Installation of 8” Ø high pressure header at the inlet manifold skid at

Ogharefe Flowstation.

(iv) Construction of OLOGBO J(10) Flow lines (2 x 4” x 2km) and Extension of MANIFOLD SKID.

(v) Salvaging of Existing Old and New Flow lines/Backfilling

(vi) Construction of ONA-2 VANDALISED FLOWLINE (1.2km) and across road formation.

(vii) Construction of ASABORO 5 Flowline and New Manifold Fabrication with valves

(viii) Construction of ASABORO 6 & 7 flowline and hook to new manifold

(ix) Construction of Ogharefe Well 6 Hook-up Assembly and provision of all valves

(x) Construction of Ogharefe-1 Hook-up Assembly and Looping to Ogharefe-1 short string.

(xi) Supply of Plidco Clamp and Clamping of Ossiomo 6” Leak Repairs.

(xii) Installation of Storage Tanks at Ovade Flowstation and Upgrade Works on the Warri Office

Storage Tanks.

(xiii) Roofing of Generator House at Warri Office.

(xiv) Ologbo Exposed Flowline Repair Prolect.
(xv)  Consruction of water ring main at ogharefe flowstation
(xvi) Construction of 6" X 2.5KM OWE-1 FLOWLINES
(xvii)Construction of dual 4" x 5.5km Erinwindu-3 flowlines
(xviii) Construction of dual 6" x 9km Pipeline ONA-5 to ONA-2 Manifold
 

    CHEVRONTEXACO (NIGERIA) LIMITED,(CNL) WARRI

(i) Resurfacing of damaged road pavement in Chevron Main Office, Warri.

(ii) Concrete resurfacing/renovation works at Chevron Nigeria Limited

Mechanical Workshop, Warri.

(iii) Building of a blockwall and construction of a Gate Protector/Tank

Protector at Chevron Clinic, Warri.

(iv) Renovation and painting of Chevron Guest House at Deco Road -

(v) Construction and Fabrication of Structural items:

 Bottle Rack Fabrication.

 Run way Skid Fabrication.

 Divers Flat form Fabrication.

 Staircase Fabrication

 Beams and Hand Rails Construction.

(vi) CPG Fabrication of 10 (Ten) Standard Gated Cargo Basket.

(vii) CPG Fabrication of various piping spools

(viii) CPG Fabrication of 10 (Ten) Cutting Boxes.

(ix) Fabrication of WAGP VSAT Structural Access Platform & 11Nos Cable Steel Supports

    NIGERIAN PETROLEUM DEVELOPMENT COY. LTD. BENIN CITY (NPDC) subsidiary of NNPC

(i) Construction of Abura-B Drilling Location, Access road and camp site.

(ii) Construction of ABURA well 6 location and installation of all valves

(iii) Renovation of Abura Well 4 for work-over rig.

(iv) Rectification of pollution problem at Abura-6 location.

(v) Clearing and excavating of Abura-6 Flare Pit.

(x) Constuction of Abura – 9 well head ligament hook up, purchase and installations of valves

and extra works

(xi) Construction Of Oredo J & K Flow line

(xii)  Contruction of OREDO 3s +l Gas line

(xiii)  Recommissioning of OREDO 9L & S FLOWLINES

(xiv)  HOOK-UP &TIE-IN OF OREDO 8B, 10 & 11 FLOWLINES

(xv) Additional works for hook up of  constructed OREDO 3 & 13flowlines to the gas manifold at the proposed oredo gas supply facility to PAN OCEAN.

   WALTERSMITH PETROMAN OIL COMPANY (WSPOL)
(I) Fabrication and installation of a 3" relief  line from scrubber to gas flare header.
(II) Ibigwe flowstation modication,comprising adjustable choke relocation and isolation valves and installation of gas line.
(III) Emergency tapping of the product gasline to the flare pilot line and construction of individual sunction line for compressor 1& 2
(IV) Fabrication and installation works at ibigwe.
(V) Fabrication/installation of product trans line for ibigwe 8
(VI) Fabrication,installation,modification and miscelleneous work at ibigwe.
(VII) Fabrication and installation of a temporary product trans line and flowstation inlet manifold modification
(VIII) Ibigwe-8 flowline hook up
(IX) Construction of ibigwe-7 flowlines and manifold extention works
(I) IBIGWE -2 GAS SCRUBBER HOOK UP


NIGERIA DREDGING AND MARINE/SPDC

(i) 4” Ø Flowline at Sapele West Oil Field

(ii) 6” Ø Flowline at Sapele West Oil Field

  FEDERAL GOVERNMENT OF NIGERIA (P.T.F.)FEDERAL GOVERNMENT OF NIGERIA (P.T.F.)

(i) Enhancing Data Processing Capacity of National Business and Technical Examination

Board (NABTEB) Benin City - Rehabilitation of Administrative Block and External Works.

(ii) Civil Works - Building of New Generator House, New Drainage System at NABTEB - Benin

City.

(iii) Building & furnishing of Four (4) bedroom Guest house for NABTEB

NATIONAL BUSINESS AND TECHANICAL EXAM BOARD(NABTEB)

(i) Building Of Another Generator House. NABTEB - Benin City.

(ii) Construction of Diagonal Road Crossing Drain . NABTEB - Benin City.

(iii) Construction Of A Multi Purpose Vehicle Park. NABTEB - Benin City.

(iv) Painting Internal Of Computer/Admin Block. NABTEB - Benin City.

(v) Installation of Electrical and Mechanical works for New Offices Blocks A and B at NABTEB

Headquarters – Benin City.





   STANDARD ENG. CONST COY LTD (SELF)

(i) Building and furnishing of Two Storey Building containing Eight (8) flats of Two bedroom

each for staffs. (COMPLECTED)

(ii) Building and furnishing of Four bedroom COMPANY Guest house and security house

(COMPLECTED)

(iii) Building and furnishing of a four (4) floor HOTEL Building containing thirty (30) various type

of rooms (ONGOING)



SOME REFEREES TO BE CONTACTED FOR ANY INFORMATION

1. MANAGING DIRECTOR OR OPERATIONS MANAGER,
PAN OCEAN OIL CORP. NIG.,
THE ARK TOWER
PLOT 17 LIGALI AYORINDE AVENUE
VICTORIA ISLAND
LAGOS. NIGERIA


2. MANAGING DIRECTOR OR PRODUCTION MANAGER
DUBRI OIL COMPANY LIMITED,
THE OCTAGON
13A A.J. MARINHO DRIVE,
VICTORIA ISLAND ANNEXE,
LAGOS. NIGERIA


3. MANAGER ENGINEERING AND FACILITIES,
SHELL PETROLEUM DEVELOPMENT COMPANY LTD (SPDC – west)

4. MANAGING DIRECTOR,
NIGERIA GAS COMPANY (NGC)
(Subsidiary of NNPC)